Ipm iteration planning meeting

Located in: Product
  • The product manager walks through the backlog

  • Stories are estimated using Story points that are based on complexity

  • Estimate using poker. Everyone writes out their story point estimate without seeing the other answers. Discuss between the high and lows if there is variance.

  • Mini IPM

    • 15-30 min meeting w/ 2+ Engineers to point a few stories
    • Think of it as a side-of-desk quick IPM sync
  • Pre-IPM

    • 30-45 min meeting w/ 1-2 Engineers instead of entire team (ideally w/ Senior) to discuss stories before IPM
    • Pair to discuss important implementation notes, questions/blockers, potential Eng Review items, etc. No story pointing.
    • Also used if the IPM conversation goes too long on a specific topic
  • Pre IPM to go through teh techincal solution: 202107261436 Engineering Review Sessions

    • What needs to be prototyped?
  • product IPM and technical IPM

  • Avoid making a lot of compromises on the UX and the product

  • Spend 5min on discussing it, if it requires technical deep dive assign someone and move on

  • Wireframes keep the conversation focused

  • Not a time for solutioning, that should happen outside this meeting